Members Management

Keyed Convention

What is locked across the campuses, and which key opens it. Search any section by location or key type.

Physical Building Locks

Every keyed door in a building, what it secures, and which key opens it.

#CampusRoom #DescriptionKey TypeNotes
1Chapel Campus103East Vestibule to SanctuaryClassroom2023 key audit — The Chapel. Currently opens with Master Only.
2Chapel Campus111Under Stairs Storage to Back HallwayStorage2023 key audit — The Chapel.
3Chapel Campus110Back Stage to Mechanical Room 110Mechanical2023 key audit — The Chapel. Currently opens with Storage.
4Chapel Campus109Sanctuary to Back StageStorage2023 key audit — The Chapel. Currently opens with Master Only.
5Chapel Campus107BMechanical Room 108 to IT/AMP RoomMechanical2023 key audit — The Chapel.
6Chapel Campus107ASanctuary to IT/AMP RoomMaster Only2023 key audit — The Chapel. Currently opens with Storage.
7Chapel Campus106BSide Storage to SanctuaryStorage2023 key audit — The Chapel.
8Chapel Campus106ACenter Storage to SanctuaryStorage2023 key audit — The Chapel.
9Chapel Campus104West Vestibule to SancutaryClassroom2023 key audit — The Chapel. Currently opens with Master Only.
10Chapel Campus128Storage 130 to Preschool RoomStorage2023 key audit — The Chapel. Currently opens with Other. Audit note: Other – None.
11Chapel Campus101East Stairwell to OperationsMechanical2023 key audit — The Chapel. Currently opens with Office.
12Chapel Campus100DEast Stairwell to LobbyClassroom2023 key audit — The Chapel. Currently opens with Master Only.
13Chapel Campus100CEast Vestibule to LobbyClassroom2023 key audit — The Chapel. Currently opens with Master Only.
14Chapel Campus100BWest Vestibule to LobbyClassroom2023 key audit — The Chapel. Currently opens with Master Only.
15Chapel Campus100ABack Hallway 111 to LobbyMaster Only2023 key audit — The Chapel.
16Chapel Campus133Production Storage to SanctuaryStorage2023 key audit — The Chapel.
17Chapel Campus131Back Hallway 126 to GarageClassroom2023 key audit — The Chapel. Currently opens with Master Only.
18Chapel Campus115BBack Hallway to KitchenIndependent2023 key audit — The Chapel. Currently opens with Master Only.
19Chapel Campus127Back Hallway 126 to NurseryClassroom2023 key audit — The Chapel. Currently opens with Master Only.
20Chapel Campus126Preschool Room to Back Hallway 126Classroom2023 key audit — The Chapel. Currently opens with Master Only.
21Chapel Campus125Back Hallway 126 to GarageClassroom2023 key audit — The Chapel. Currently opens with Master Only.
22Chapel Campus124Back Hallway to Orange RoomClassroom2023 key audit — The Chapel. Currently opens with Storage.
23Chapel Campus121BStorage Closet to 678 SpaceStorage2023 key audit — The Chapel. Currently opens with Office.
24Chapel Campus121ABack Hallway to 678 SpaceClassroom2023 key audit — The Chapel. Currently opens with Master Only.
25Chapel Campus120Back Hallway to Volunteer CentralClassroom2023 key audit — The Chapel. Currently opens with Office.
26Chapel Campus119BStorage Closet to 678 SpaceStorage2023 key audit — The Chapel.
27Chapel Campus119ABack Hallway to 678 SpaceClassroom2023 key audit — The Chapel. Currently opens with Office.
28Chapel Campus118Family Room to Nursing Mother's RoomClassroom2023 key audit — The Chapel. Currently opens with Master Only.
29Chapel Campus116BBack Hallway to Family RoomClassroom2023 key audit — The Chapel. Currently opens with Master Only.
30Chapel Campus116AStorage Closet 117 to Family RoomStorage2023 key audit — The Chapel. Currently opens with Mechanical.
31Chapel Campus115CWest Stairwell to KitchenMaster Only2023 key audit — The Chapel.
32Chapel Campus115ACustodial Closet to KitchenStorage2023 key audit — The Chapel. Currently opens with Mechanical.
33Jefferson Campus101AWest Main Vestibule to LobbyClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
34Jefferson Campus101CEast Main Vestibule to LobbyClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
35Jefferson Campus153Cafe to Custodial ClosetMechanical2023 key audit — Jefferson Campus.
36Jefferson Campus152Cafe to KitchenIndependent2023 key audit — Jefferson Campus.
37Jefferson Campus124ASafe Room to Storage Room 124Independent2023 key audit — Jefferson Campus.
38Jefferson Campus141CGarage North to KIDS HallwayClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
39Jefferson Campus141BGarage Central to KIDS HallwayClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
40Jefferson Campus141AGarage South to KIDS HallwayClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
41Jefferson Campus140KIDS Hallway to KIDS CheckinMaster Only2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
42Jefferson Campus139Little KIDS Checkin to Blue RoomClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
43Jefferson Campus138Little KIDS Checkin to Green RoomClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
44Jefferson Campus136Little KIDS Checkin to Orange RoomClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
45Jefferson Campus135Little KIDS Checkin to Purple RoomClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
46Jefferson Campus128CStorage Room 133 to North RoomStorage2023 key audit — Jefferson Campus.
47Jefferson Campus128BMechanical 130 to North RoomMechanical2023 key audit — Jefferson Campus.
48Jefferson Campus128ALobby to North RoomMaster Only2023 key audit — Jefferson Campus.
49Jefferson Campus127BNorth Room to ClassroomsClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
50Jefferson Campus127ALobby to ClassroomsClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
51Jefferson Campus126Lobby to Volunteer CentralClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
52Jefferson Campus124BOffice Space to Storage Room 124Storage2023 key audit — Jefferson Campus.
53Jefferson Campus147KIDS Hallway to Preschool RoomClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
54Jefferson Campus122Office Space to Mechanical RoomMechanical2023 key audit — Jefferson Campus. Currently opens with Storage.
55Jefferson Campus121Office Space to Operations OfficeIndependent2023 key audit — Jefferson Campus.
56Jefferson Campus120Office Space to Campus PastorIndependent2023 key audit — Jefferson Campus.
57Jefferson Campus119Office Space to Associate Campus PastorIndependent2023 key audit — Jefferson Campus.
58Jefferson Campus1163rd Space to Conference RoomClassroom2023 key audit — Jefferson Campus. Currently opens with Master Only.
59Jefferson Campus115Office to Back Stage WestMaster Only2023 key audit — Jefferson Campus.
60Jefferson Campus113Storage 110 to Back Stage EastStorage2023 key audit — Jefferson Campus. Currently opens with Mechanical.
61Jefferson Campus112Back Stage East to Green RoomMaster Only2023 key audit — Jefferson Campus.
62Jefferson Campus111Storage 110 to IT/Amp RoomMaster Only2023 key audit — Jefferson Campus. Currently opens with Mechanical.
63Jefferson Campus104Storage 109 to MainStorage2023 key audit — Jefferson Campus.
64Jefferson Campus103COffices to 3rd SpaceMaster Only2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
65Jefferson Campus103BBack Stage Ramp to 3rd SpaceMaster Only2023 key audit — Jefferson Campus. Currently opens with Storage.
66Jefferson Campus103AMain to 3rd SpaceClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
67Jefferson Campus101BLittle Kids Checkin to LobbyMaster Only2023 key audit — Jefferson Campus.
68Jefferson Campus145Garage to Center KIDS classroomClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
69Jefferson Campus144Garage to West KIDS classroomClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
70Jefferson Campus141DPreschool to KIDS HallwayClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
71Jefferson Campus149KIDS Hallway to Resource RoomClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
72Jefferson Campus146Garage to East KIDS classroomClassroom2023 key audit — Jefferson Campus. Currently opens with Jeff Class.
73Pickerington Campus1041KIDS Hallway to Preschool EastClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage, Other. Audit note: Other – Cg.
74Pickerington Campus1055Cafe to KitchenIndependent2023 key audit — Pickerington Main Building.
75Pickerington Campus1053Mechanical 1057 to CafeMechanical2023 key audit — Pickerington Main Building.
76Pickerington Campus1051Garage to Room 312Classroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage, Other. Audit note: Other – Cg.
77Pickerington Campus1050Garage to Family MinistriesClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
78Pickerington Campus1048Green Room to Mechanical Room 1048Mechanical2023 key audit — Pickerington Main Building.
79Pickerington Campus1047WOffice Hallway to Green RoomMaster Only2023 key audit — Pickerington Main Building.
80Pickerington Campus1047EGarage to Green RoomStorage2023 key audit — Pickerington Main Building. Currently opens with Other. Audit note: Other – ?; Storage – S.
81Pickerington Campus1046Garage to Game RoomClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
82Pickerington Campus1045Garage to 2nd StreetClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
83Pickerington Campus1044Storage 1049 to GarageStorage2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
84Pickerington Campus1043KIDS Hallway to Preschool WestClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage, Other. Audit note: Other – Cg.
85Pickerington Campus1031SLittle KIDS Checkin to Green RoomClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
86Pickerington Campus1039KIDS Hallway to Resource RoomClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage, Other. Audit note: Other – Cg.
87Pickerington Campus1038Storage 1040 to KIDS HallwayStorage2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
88Pickerington Campus1035W3Garage to KIDS HallwayClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
89Pickerington Campus1035W2Garage to KIDS HallwayClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
90Pickerington Campus1035W1Garage to KIDS HallwayClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
91Pickerington Campus1035NStorage 1052 to KIDS HallwayStorage2023 key audit — Pickerington Main Building.
92Pickerington Campus1034KIDS Hallway to KIDS CheckinMaster Only2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
93Pickerington Campus1033Orange Room to Blue Room Em AccessMaster Only2023 key audit — Pickerington Main Building. Currently opens with Office.
94Pickerington Campus1032Little KIDS Checkin to Blue RoomClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
95Pickerington Campus1031EKIDS Hallway to Orange RoomMaster Only2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
96Pickerington Campus1031WOrange Room to Green Room E AccessMaster Only2023 key audit — Pickerington Main Building. Currently opens with Office.
97Pickerington Campus1026EFamily Ministries to 678/HSM OfficeMaster Only2023 key audit — Pickerington Main Building.
98Pickerington Campus1004Back Hallway to Overflow NorthClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
99Pickerington Campus1015Office Hallway to Discipleship Pastor's OfficeIndependent2023 key audit — Pickerington Main Building.
100Pickerington Campus1014Office Hallway to Executive AdminsIndependent2023 key audit — Pickerington Main Building.
101Pickerington Campus1013BOffice Hallway to Counseling RoomIndependent2023 key audit — Pickerington Main Building.
102Pickerington Campus1013AOffice Hallway to HR Director's OfficeIndependent2023 key audit — Pickerington Main Building.
103Pickerington Campus1012Office Hallway to Exec Pator's OfficeIndependent2023 key audit — Pickerington Main Building.
104Pickerington Campus1010SConference Room to LobbyClassroom2023 key audit — Pickerington Main Building. Currently opens with Independent.
105Pickerington Campus1010WConference Room to Office HallwayMaster Only2023 key audit — Pickerington Main Building.
106Pickerington Campus1009Office Hallway to ReceptionMaster Only2023 key audit — Pickerington Main Building. Currently opens with Classroom.
107Pickerington Campus1008Back Hallway to Director of Facilities OfficeStorage2023 key audit — Pickerington Main Building. Currently opens with Classroom, Storage. Audit note: Storage – Lock is bad.
108Pickerington Campus1007Back Hallway to Grace CentralClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
109Pickerington Campus1006Back Hallway to Room 104Classroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
110Pickerington Campus1005Back Hallway to Overflow SouthClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
111Pickerington Campus1056Kitchen to PantryIndependent2023 key audit — Pickerington Main Building.
112Pickerington Campus1003Back Hallway to Family RoomClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
113Pickerington Campus1000Reception to VestibuleMaster Only2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
114Pickerington Campus1075West Vestibule to MainClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
115Pickerington Campus1071Lobby to Custodial ClosetStorage2023 key audit — Pickerington Main Building. Currently opens with Mechanical.
116Pickerington Campus1070Center Vestibule to MainClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
117Pickerington Campus1068Back Stage West to Production RoomMaster Only2023 key audit — Pickerington Main Building. Currently opens with Office, Storage, Mechanical.
118Pickerington Campus1067WBack Hallway to Back Stage WestMaster Only2023 key audit — Pickerington Main Building. Currently opens with Office, Storage, Mechanical.
119Pickerington Campus1067NMain to Back Stage WestStorage2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage, Mechanical.
120Pickerington Campus1060WStorage 1076 to MainStorage2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
121Pickerington Campus1060CSound Booth to MainMaster Only2023 key audit — Pickerington Main Building.
122Pickerington Campus1060EStorage 1069 to MainStorage2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
123Pickerington Campus1059East Vestibule to MainClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
124Pickerington Campus212Mechanical Room to Back HallwayMechanical2023 key audit — The Venue.
125Pickerington Campus1080Office Hallway to Family Ministries OfficeIndependent2023 key audit — Pickerington Main Building.
126Pickerington Campus1081Office Hallway to Office Storage ClosetStorage2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage, Other. Audit note: Other – Cg.
127Pickerington CampusExteriorExterior DoorsMaster Only2023 key audit — Pickerington Main Building.
128Pickerington Campus100Multipurpose Space to LobbyClassroom2023 key audit — The Venue. Currently opens with Independent.
129Pickerington Campus103Multipurpose Space to Mechanical Room 103Mechanical2023 key audit — The Venue.
130Pickerington Campus104Multipurpose Space to Production RoomStorage2023 key audit — The Venue. Currently opens with Office.
131Pickerington Campus107SStorage 106 to WorkshopStorage2023 key audit — The Venue.
132Pickerington Campus107NLobby to WorkshopMaster Only2023 key audit — The Venue. Currently opens with Office.
133Pickerington Campus108EWorkshop to Storage Room 108 EastStorage2023 key audit — The Venue.
134Pickerington CampusExteriorExterior DoorsMaster Only2023 key audit — The Venue.
135Pickerington Campus214Back Hallway to East Lobby StairwayMaster Only2023 key audit — The Venue. Currently opens with Independent.
136Pickerington Campus213Storage Room 213 to Back HallwayStorage2023 key audit — The Venue.
137Pickerington Campus1079Office Hallway to Lead Pastor's OfficeIndependent2023 key audit — Pickerington Main Building.
138Pickerington Campus211Back Hallway to Podcast RoomIndependent2023 key audit — The Venue.
139Pickerington Campus210Innovative Ministries Office to Director of IMIndependent2023 key audit — The Venue. Currently opens with Office.
140Pickerington Campus209Common Area to Innovative Ministries OfficeIndependent2023 key audit — The Venue.
141Pickerington Campus208EDirector of IM Office to Communications OfficeIndependent2023 key audit — The Venue. Currently opens with Other.
142Pickerington Campus208WCommon Area to Communications OfficeIndependent2023 key audit — The Venue.
143Pickerington Campus207BWeekend Services Office to Director of WESIndependent2023 key audit — The Venue. Currently opens with Office. Audit note: Office – O.
144Pickerington Campus207ACommon Area to Weekend Services OfficeIndependent2023 key audit — The Venue.
145Pickerington Campus206Common Area to Finance OfficeIndependent2023 key audit — The Venue.
146Pickerington Campus205Finance Office to EDOO OfficeIndependent2023 key audit — The Venue.
147Pickerington Campus204Storage 204 to KitchenStorage2023 key audit — The Venue.
148Pickerington Campus200Common Area to West LobbyMaster Only2023 key audit — The Venue. Currently opens with Independent.
149Pickerington Campus1078Main to Back Stage EastStorage2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
150Pickerington Campus1028Little KIDS Checkin to Purple RoomClassroom2023 key audit — Pickerington Main Building. Currently opens with Office, Classroom, Storage.
151Pickerington Campus108WWorkshop to Storage Room 108 WestStorage2023 key audit — The Venue.
152Pickerington Campus1026WOffice Hallway to 678/HSM OfficeIndependent2023 key audit — Pickerington Main Building.
153Pickerington Campus1025Office Hallway to Campus Pastor's OfficeIndependent2023 key audit — Pickerington Main Building.
154Pickerington Campus1024Office Hallway to Associate Campus Pastor's OfficeIndependent2023 key audit — Pickerington Main Building.
155Pickerington Campus1023IT Room to Safe RoomIndependent2023 key audit — Pickerington Main Building.
156Pickerington Campus1022Office Hallway to IT RoomMaster Only2023 key audit — Pickerington Main Building.
157Pickerington Campus1021Office Hallway to Campus PastorIndependent2023 key audit — Pickerington Main Building.
158Pickerington Campus1017Office Hallway to Executive AdminsIndependent2023 key audit — Pickerington Main Building.
159Pickerington Campus1030Little KIDS Checkin to Orange RoomClassroom2023 key audit — Pickerington Main Building. Currently opens with Office.
160Upper Arlington107Hallway to East OfficeClassroom2023 key audit — Upper Arlington. Currently opens with Other. Audit note: Other – Blank.
161Upper Arlington106Hallway to KitchenClassroom2023 key audit — Upper Arlington. Currently opens with Other. Audit note: Other – Blank.
162Upper Arlington104Custodial ClosetOther2023 key audit — Upper Arlington. Audit note: Other – None; Other – None.
163Upper Arlington102Lobby to Mechanical Room 102Mechanical2023 key audit — Upper Arlington. Currently opens with Storage, Mechanical.
164Upper Arlington101Back Hallway to The MainClassroom2023 key audit — Upper Arlington. Currently opens with Storage.
165Upper Arlington100The Main to LobbyClassroom2023 key audit — Upper Arlington. Currently opens with Storage.
166Upper Arlington108Hallway to West OfficeClassroom2023 key audit — Upper Arlington. Currently opens with Other. Audit note: Other – Blank.
167Upper Arlington110Hallway to 678 SpaceClassroom2023 key audit — Upper Arlington. Currently opens with Other. Audit note: Other – Blank.
168Upper Arlington111Hallway to PreschoolClassroom2023 key audit — Upper Arlington. Currently opens with Other. Audit note: Other – Blank.
169Upper Arlington112Hallway to NurseryClassroom2023 key audit — Upper Arlington. Currently opens with Other. Audit note: Other – Blank.
170Upper Arlington115Living Room to HallwayClassroom2023 key audit — Upper Arlington. Currently opens with Master Only.
171Upper Arlington117Hallway to GarageClassroom2023 key audit — Upper Arlington. Currently opens with Other. Audit note: Other – None.
172Upper Arlington118Hallway to Mechanical Room 118Mechanical2023 key audit — Upper Arlington.
173Upper Arlington119Living Room Storage to Living RoomStorage2023 key audit — Upper Arlington. Currently opens with Independent.
173 rowsPhysical Building Locks